Walls. We offer you the house of rounded logs, profiled and laminated bars. We use only healthy forest softwood pre-defined in the Arkhangelsk region.
Beams or logs we put each other on layer insulation from jute. It comes as a tape of a width 100мм, thick 17.5.
Jute is natural polymer, cellulose fibres. It is made of bast fibres jute.
The dignity of this modern material are ease to use, evenly insulation. Jute not moisture, it does not touch the birds.
Rows screws with 25-30 mm diameter wooden shifts between.
When building homes in the side faces of window and door openings necessarily leave the delay for uniform draught сруба.
If the project foresees подпорные poles we their compulsory complete компенсаторами усадки.
Adjustable reliance is set at the Poles in log houses (top or bottom pillar) to control the height of the pillar in the process of desiccation of wooden houses.
We use sawn softwood for floors, the CAP and first floor. Wood covered by antiseptics and antipirrens befor installation. Then we put rough floor and rough ceiling.
Roof. Next we install roof system from softwood materials. To increase the life of wooden construction process elements Rafter anti and flame retardants.
Roofing material in use: natural clay tiles, metal tiles, soft tarcrete tiles: "RUFLEX", "Tegola", "Shinglas", "Icopal", metal ore plastic sheet.
Attic floor require ventilation not less than 50 mm. and insulation (Rockwol) 200 mm. or as optionaly Penoplex-180mm insulation with infrared heat-clad Penofol.
The second phase of the wooden house construction is finishing. We recommend to start it after the desiccation of wood and acquire it humidity 16-18 per cent, but not earlier than 6-8 months.
On customer, bruce or lumber is polished, imbued with resistant trains and colored.
Next, we install windows and doors using following technology: cut technologic log in openings, insert casing of the deck.
The top deck between casing and the wall reserve clearance 70-100 mm, in which we put soft lagging-mineral insulation. Gaps close by battens.
Exterior walls may be warmed if necessary. Next we dismount temporary roof (tar paper) and much roofing "pie".
Next, we put hydro-wind-disc on outer lagging and foil from the premises-roof.
The second phase, we install heating systems, water supply and sanitation, electrics.
We recommend to start finishing works in a wooden house not earlier than 2-3 months after heating launch.